Skip to content

Cookie settings

Choose which purposes you consent to. Nothing is on beforehand, and nothing is fetched until you save. You can change or withdraw your consent at any time via “Cookie settings” at the foot of the page.

Cookie settings

Make the site work and remember the choice you make here. They cannot be switched off, and they do not require your consent.

Show services (1)
  • HLM Landmåling · Provider: HLM Landmåling A/S
    Remembers your cookie choice so you are not asked again on every page.
    hlm_consent (12 months)

Show content we pull in from others - maps, video and 360° views. Without them you get a placeholder you can click if you want to see the content anyway.

Show services (2)

Measure which pages get read, so we can make them better. Not used to recognise you as a person.

Let advertising tools measure what happens after a click on an ad, and follow you across websites.

Show services (1)
  • KOMO Evolution360 · Provider: KOMO A/S
    Measures which ads and sources lead to enquiries: where you came from, and whether you call, write or send the contact form. The content of the form is also sent to KOMO.
    _evo_visit (Persistent (localStorage)), _evo_ref (Persistent (localStorage)), _evo_gclid (Persistent (localStorage)), _evo_keyword (Persistent (localStorage)), _pk_id.* (13 months), _pk_ses.* (30 minutes), _pk_ref.* (6 months)
    KOMO A/S (opens in a new window)
High-rise seen from below against the sky

References

The foundation beneath major builds.

A selection of the tasks we deliver data and setting-out for - in the field, in the air and in 3D. From roads and tunnels to high-rise and utilities.

References In the field, in the air, in data

Selected projects

From Fehmarn to Kangerlussuaq - a selection of the tasks we've delivered the foundation for. Pick a category, or see them all.

Infrastructure & civil works

12 projects

Femern-forbindelsens landanlæg

From Ringsted to Rødbyhavn we have surveyed, set out and monitored on both rail and bridges. The task spans several contracts and contractors, demanding a shared control network that holds all the way.

Surveying · 3D scanning · machine control · monitoring · quantities

Carried out for MJ Eriksson, MT Højgaard, Arkil, C. Holbøll & Sønner

The Danish Road Directorate - nationwide surveying

We handle detail surveys, control points and setting-out for inspection and expropriation for the Road Directorate nationwide - from the 3rd Limfjord crossing to cycle paths in Thy.

Surveying · detail surveys · control points · expropriation setting-out

Carried out for Vejdirektoratet

Widening the E45

Denmark's busiest motorway is being widened in stages - we've been on it around Kolding and between Skanderborg and Horsens. Machine control and running quantity surveys keep the earthworks on track.

Surveying · machine control · quantities · control points

Carried out for MT Højgaard, Munck Havne & Anlæg, DAV Nordic

Kalundborgmotorvejen

A new motorway to one of Denmark's fastest-growing industrial areas. We established the control network and followed the works for two contractors.

Surveying · control points · machine control

Carried out for MJ Eriksson, Munck Havne & Anlæg

Køge Bugt Motorway

Widening a motorway in operation, with traffic running throughout. We delivered machine control and quantities for the earthworks and monitored the adjacent structures.

Surveying · machine control · quantities · monitoring

Carried out for Mobilis TBI Infra, MJ Eriksson, Züblin

The Fjord Link, Frederikssund

The high bridge over Roskilde Fjord is the project where most of our services were in play at once - down to 3D-printed models of construction details used to settle the geometry before casting.

Surveying · 3D scanning · 3D print · machine control · monitoring · quantities

Carried out for MJ Eriksson, Jorton

Nordhavn Tunnel

An immersed tunnel under Svanemølle Bay, built in one of the city's densest areas. Precision and monitoring are non-negotiable when excavating next to existing buildings.

Surveying · monitoring

Carried out for BESIX-MT Højgaard JV

Cloudburst protection of Copenhagen

The Valby cloudburst tunnel is bored 2.4 km from Valby to Sydhavnen - we followed the secant piles, shafts and the tunnelling itself, plus cloudburst shafts at Halmtorvet and Kalvebod Brygge.

Surveying · 3D scanning · georadar · control points · monitoring

Carried out for MT Højgaard, Eiffage Infra-Spezialtiefbau, NCC Danmark, SMT Nordic

Bridges & bridge renovation

We have surveyed and monitored some of the country's largest bridges - from Storstrømsbroen and the Old Little Belt to new bridges in Nykøbing F. and Randers. Monitoring under load is a fixed part of the job.

Surveying · 3D scanning · monitoring

Carried out for Per Aarsleff, MT Højgaard, SMT Nordic, Arkil, DAV Nordic, Jorton

Noise barriers along the motorway network

Ten stretches from Aalborg to western Funen. Noise-barrier foundations must sit millimetre-true, or the elements won't fit - and you only find out once the crane is there.

Surveying · setting-out · machine control

Carried out for Munck Havne & Anlæg, Saferoad Daluiso, DAV Nordic, Groundplug International

Copenhagen Airport

We've worked in the airport through several expansions - Terminal 2, Terminal 3 and Pier E. Building in operation means short time windows and no margin for error.

Surveying · 3D scanning

Carried out for Per Aarsleff, Give Stålspær, HSHansen, Jakon

Ports & quay structures

From the port expansion in Aalborg to Pakhuskajen in Odense and Østhavnsvej in Aarhus. Quays are surveyed above and below the waterline, and drones give the overview of the earth quantities.

Surveying · drone surveying · machine control · quantities · georadar

Carried out for Munck Havne & Anlæg, De Fakto, Arkil, Per Aarsleff

Rail, metro & light rail

7 projects

New line across western Funen

Seven contracts on the Spedsbjerg-Gribsvad stretch, from foundations and bridge setting-out to groundwater monitoring. A new line through open country makes big demands of the control network.

Surveying · bridge setting-out · foundations · groundwater monitoring

Carried out for MJ Eriksson

The new Copenhagen-Ringsted line

Denmark's first high-speed railway. We followed both the main project and TP4, and have since carried on along the Ringsted-Slagelse stretch.

Surveying · machine control · monitoring · quantities

Carried out for MJ Eriksson, Züblin, Per Aarsleff

Metro Cityringen & the Nordhavn metro

Two metro stages beneath Copenhagen. Working underground in a dense city demands monitoring of everything above - and a control network that does not move.

Surveying · machine control · monitoring · quantities

Carried out for CG Jensen, Per Aarsleff, MetNord JV

Greater Copenhagen Light Rail & Odense Light Rail

Both Danish light-rail projects. Tracks in existing streets mean utility diversions, tight work areas and neighbours who still need to reach their front door.

Surveying · 3D scanning · machine control · monitoring · quantities

Carried out for Per Aarsleff, MJ Eriksson, CG Jensen, Arkil, Comsa-Munck JV, Hans Jørgensen & Søn

Aarhus Central Station

Rebuilding a station from 1929 that never closed along the way. We scanned the existing structure and surveyed through three stages.

Surveying · 3D scanning

Carried out for Aarsleff Rail, Per Aarsleff

Stations & rail works

Ny Ellebjerg, Hillerød, Hjørring, Kokkedal, Carlsberg and Taulov - plus the Valby-Svanemøllen S-train stretch. Track work happens in possessions, and there are no extensions to be had.

Surveying · 3D scanning · georadar

Carried out for Aarsleff Rail, Per Aarsleff, MJ Eriksson, Spitzke, Banedanmark

DSB's new workshops

Workshops in Næstved, Brabrand and at Otto Busses Vej. The track geometry indoors has to meet what the trains arrive on from outside.

Surveying · setting-out

Carried out for MT Højgaard, MJ Eriksson

Energy, utilities & buried services

7 projects

HySynergy, Fredericia

One of Europe's first industrial-scale hydrogen plants. We surveyed and scanned through the construction of the facility at the Shell refinery.

Surveying · setting-out · 3D scanning

Carried out for Everfuel

Offshore wind farms

Rødsand 2 and Sprogø offshore wind farm. Offshore surveying has its own terms: everything must sit right first time, because you don't just drop by again tomorrow.

Surveying · machine control · offshore · quantities

Carried out for Per Aarsleff

Amager Power Station - BIO 4

Converting Amager Power Station to biomass. We scanned the existing plant and set out the new works in between pipes that could not be touched.

Surveying · 3D scanning

Carried out for Per Aarsleff, Arkil, Züblin

Waste-to-energy - ARC & Vestforbrænding

Amager Resource Centre and a new scrubber at Vestforbrænding in Glostrup. Alterations to plants in operation always start with a scan of what is actually there.

Surveying · 3D scanning

Carried out for Züblin, Götaverken Miljö

Power stations & refinery

Kyndbyværket, Jægerspris and Kalundborg Refinery. Georadar finds the utilities the drawings don't show - and at a refinery that's the difference between a calm day and a very bad one.

Georadar · surveying · 3D scanning

Carried out for Ørsted Bioenergy & Thermal Power, Kalundborg Refinery, Entreprenør Benny Petersen, Anton Knudsen Egtved

Treatment plants & water supply

Eight Danish treatment plants scanned and documented - from Thisted to Stegholt - plus Tinghøj reservoir and Søndersø waterworks. The point cloud becomes the basis for the next rebuild.

3D scanning · drone surveying · georadar

Carried out for Arwos, Samn Forsyning, Mariagerfjord Vand, Silkeborg Spildevand, Thy Renseanlæg, Herning Rens, Forsyning Helsingør, HOFOR

Georadar & utility detection

Around 60 standalone jobs a year: district heating, parking basements, oil tanks, underfloor heating, rebar and tree roots. We map what lies beneath the surface before the digger hits it - and we do it in Kangerlussuaq too.

Georadar (GPR) · utility detection · oil-tank detection · void & rebar scanning

Carried out for Municipalities, utilities, consultants and private clients - incl. Tivoli, HOFOR, University of Copenhagen, DTU, Greenland Airports

Life science & healthcare

4 projects

Novo Nordisk, Kalundborg

Over 45 sub-tasks on the site expansion across several years - from PPV and M3 South to penetration procedures and Dalux coordination for plumbing and ventilation. We've been a fixed presence as the site has grown.

Surveying · setting-out · georadar · 3D scanning · machine control · BIM & Dalux

Carried out for Per Aarsleff, MJ Eriksson, NCC, Kemp & Lauritzen, NNE, Zøllner, KW Betonteknik, Multi-Tech

Novo Nordisk - Hillerød, Bagsværd & Odense

Beyond Kalundborg we've worked at Novo's sites in Hillerød, Bagsværd and Tietgenbyen. Production in operation sets the terms: access is agreed, and the work happens when it can.

Surveying · setting-out · georadar · 3D scanning

Carried out for Pihl, NCC, Creco, Give Steel, Munck Havne & Anlæg, Eiler Thomsen, MJ Eriksson

Pharma & life science

Lundbeck, Leo Pharma, Fujifilm, Pronova Biopharma, Novonesis and Statens Serum Institut. Cleanroom construction has tolerances closer to machine industry than to ordinary building.

Surveying · setting-out · georadar · 3D scanning · drone surveying

Carried out for GAP Entreprise, NNE Pharmaplan, Niras, Per Aarsleff, Østermark

Hospital & healthcare construction

Køge University Hospital, psychiatry in Aalborg, Bispebjerg, Glostrup, Børneriget and Hvidovre. Hospital construction almost always happens right next to a hospital still treating patients.

Surveying · setting-out · georadar

Carried out for MJ Eriksson, De Fakto, LM Byg, Region Hovedstaden

Commercial, data centres & logistics

6 projects

Data centres in Denmark

We've delivered 14 jobs across three Danish data-centre locations - Fredericia, Køge and Odense. The builds are enormous, the schedules tight, and the tolerances tighter than the scale suggests.

Surveying · setting-out · terrain scanning · drone surveying · georadar · control surveys

Carried out for MT Højgaard, MJ Eriksson, Munck Havne & Anlæg, CSK Stålindustri, John Sisk & Son, Malmö Mätteknik

Corporate headquarters

Systematic in Aarhus, Copenhagen Towers, DSV's head office, two extensions of MOE's HQ and Aura HQ in Hasselager. Glass-and-steel facades forgive nothing.

Surveying · 3D scanning · machine control · monitoring

Carried out for Per Aarsleff, MT Højgaard, Jørgen Friis Poulsen, ROP, MJ Eriksson

UNICEF Global Warehouse, Nordhavn

Seven contracts in one build - from earthworks and foundations to steel and shell. The world's largest humanitarian warehouse.

Surveying · setting-out · drone surveying · foundations · steel & shell

Carried out for MT Højgaard

Logistics & warehouse centres

DSV in Horsens, FTZ in Assens, Lidl's central warehouse in Køge and DHL in Kastrup. Big halls with column rows, where a deviation in one corner grows all the way through the building.

Surveying · setting-out · machine control

Carried out for DS Flexhal, MJ Eriksson, Ajcon, HM Entreprenør, MT Højgaard, HCS

MAN Energy Solutions - The Valley Campus

Four contracts on MAN's new campus. Industrial construction where the production equipment was designed before the building - and the building has to fit it.

Surveying · setting-out

Carried out for MJ Eriksson, DS Flexhal

Retail & shopping centres

Rødovre Centrum, Glostrup Storcenter, IKEA in Copenhagen and City Vest. Rebuilding a centre in operation is construction with customers in the room.

Surveying · 3D scanning · setting-out

Carried out for Per Aarsleff, Raundahl & Moesby, MT Højgaard, A. Enggaard, Jysk Erhverv & Råhus

Building & urban development

3 projects

Carlsberg City District

The high-rises and Dahlerup's Tower. Tower construction is measured unlike anything else: plumb deviation must be checked all the way up, floor by floor.

Surveying · monitoring

Carried out for Züblin

Postgrunden, Copenhagen

One of the capital's biggest urban-development projects, built on top of a demolished post office in the middle of the city. We scanned, surveyed and monitored through demolition and construction.

Surveying · 3D scanning · monitoring

Carried out for CG Jensen, Per Aarsleff, G. Tscherning

Gartnerbyen, Rødovre

Nine plots in Rødovre's new town centre - from Borgerhuset to Lavendelrækkerne and Dahliahaven. Same client, same foundation, nine times in a row.

Surveying · setting-out · machine control

Carried out for A. Enggaard

Infrastructure

Part of Denmark's backbone

Over the past decade we've delivered surveying and data to a large share of the country's heavy infrastructure - motorways, railways, bridges and tunnels. When the build is large-scale, we're part of the foundation.

Motorways

Surveying and setting-out on many of the past decade's motorway expansions and new stretches.

Railway

Track, stations and electrification - data and setting-out for major rail projects nationwide.

Bridges

From foundation to span - precise control and deformation monitoring on bridge and viaduct builds.

Tunnels & civil works

Control networks, breakthroughs and as-built on demanding tunnel and civil-works projects.

Clients Denmark's largest

We deliver the foundation for the country's largest contractors

The country's largest contractors, consultants, industry, utilities and public sector bring us in when the foundation has to be right.

Contractors (50)

  • MJ. Eriksson
  • MT Højgaard
  • Per Aarsleff
  • Aarsleff Rail
  • Kemp & Lauritzen
  • Munck Havne & Anlæg
  • Munck Forsyningsledninger
  • A. Enggaard
  • Karise Anlæg & Byg
  • Zøllner
  • ROP
  • CG Jensen
  • Nordstern
  • NCC Danmark
  • 5E Byg
  • Saferoad Daluiso
  • GAP Entreprise
  • Enemærke & Petersen
  • DS Flexhal
  • CRECO
  • KT Erhvervsbyg
  • Hoffmann
  • Jorton
  • Ebbe Dalsgaard
  • Hansson & Knudsen
  • Give Steel
  • Scheller, Hougaard & Petersen
  • Holbøll
  • Brdr. K. Hansen
  • I. Anker Andersen
  • DAV Nordic
  • Arkil
  • JCN Bolig
  • CSK Stålindustri
  • Benny Petersen
  • HMC
  • Nordkysten
  • Malmos
  • LM Byg
  • Pihl & Søn
  • Tscherning
  • Wicotec Kirkebjerg
  • C.C. Contractor
  • Oknygaard
  • Züblin
  • Forstas
  • Bravida
  • Gorm Hansen & Søn
  • DS Stålkonstruktion
  • Fjerring

Consultants & architects (10)

  • COWI
  • Rambøll
  • NIRAS
  • Sweco Danmark
  • AFRY
  • Artelia
  • Søren Jensen
  • ABC Rådgivende Ingeniører
  • AI Arkitekter & Ing.
  • Rønnow Arkitekter

Industry (4)

  • Novo Nordisk
  • Novozymes
  • LEO Pharma
  • Arla Foods

Utilities (9)

  • Hofor
  • Novafos
  • VandCenter Syd
  • NK-Spildevand
  • Herning Vand
  • Thy Renseanlæg
  • Aalborg Kloak
  • Arwos
  • GlobalConnect

Municipalities & public sector (11)

  • Vejdirektoratet
  • Banedanmark
  • Københavns Kommune
  • Frederiksberg Kommune
  • Gentofte Kommune
  • Albertslund Kommune
  • Ballerup Kommune
  • Vejle Kommune
  • Københavns Universitet
  • Folketinget
  • Storebælt
Frequently asked questions About the work

What do you do, and for whom?

What kinds of projects do you work on?

We deliver the foundation for motorways, railways, bridges, tunnels and large civil works, for building at height, and for utilities below ground. The skills are the same every time - what changes is the scale, the accuracy demanded and the documentation.

Who are your customers?

Denmark's largest contractors are the biggest group, alongside consultants and architects, industry, utility companies, and municipalities and public clients. We live off good partnerships, and they are what give us access to Denmark's largest civil works and buildings.

Can I get a reference for a job like mine?

Yes. Call +45 32 12 51 15 or write to kontakt@hlm.as and tell us what the job involves, and we will find a comparable one and the colleague who ran it.

Do you also work on railways and infrastructure?

Yes. Motorways, railways, bridges, and tunnels and civil works are among the areas we survey and document, and several of those jobs run in track possessions and night work, where the window is fixed and the data has to be right first time.

Contact

How can we help?

Got a question or a task in mind? Call or write - we'll get back to you within one working day.

+45 32 12 51 15 or fill out the form

Ask us

Brief & no obligation - you'll hear from us soon.